subscribesubscriber servicescontact usabout ussite mapBuy a Classified
Thu, Mar 18 2010 

Resources

print this story   Print this story
  Post to del.icio.us

Photos



Herald photo by Michael Schaffer / The Oskaloosa Herald


Published June 02, 2008 10:30 am - A study group is looking at different routes a corridor from Pella could take north to Interstate 80, including some in Mahaska County.

Group looking for connector to I80
Mahaska County old Highway 102 and roads T33 and T38 are being considered

By MICHAEL SCHAFFER
The Oskaloosa Herald

OSKALOOSA

A feasibility study group with a $510,000 federal government 80/20 matching earmark is analyzing where to locate a 20-mile transportation corridor from Pella north to Interstate 80.

The feasibility study will review terrain, existing roadway conditions, locations and crash data on existing routes to determine a traffic model. The traffic model will be used to determine the type of corridor and placement.

The group is looking at several different routes a corridor could take north to Interstate 80, including some in Mahaska County. A sub consultant to the firm doing the feasibility study, Veenstra & Kimm, of West Des Moines, in a letter to Jerry Nusbaum, Mahaska County engineer, indicated they were interested in several Mahaska County roads.

“My request to your office is for a copy of as-built/record drawings for the following County Roads within your jurisdiction in the area of interest,” states the May 13 letter sent to Nusbaum by Veenstra & Kimm and signed by Greg Roth, project manager. “In Mahaska County, Old Highway 102 from west County line to New Sharon and County Roads T33 and T38 north of Old 102 to north County line.”

In a recent conversation, Nusbaum indicated U.S. Rep. Leonard Boswell secured the money and the feasibility study group was looking at three different routes out of Pella — one west, one north and one east.

Pella Public Works Director Denny Buyert said members of the study group include county engineers, supervisors, community development, sub consultants and the engineering consulting firm, CH2M HILL, Inc.

Buyert said the feasibility study would determine the type of roadway required and its placement.

“So, to do a feasibility study of this magnitude, you know doubt need to look a couple miles each side of Pella,” Buyert said. “And potentially more, but right at the moment it’s a couple of miles each side of Pella. It’s actually funnel-shaped all the way to Interstate 80.

“We don’t know if it will be an improved two lane, super-two they call it, or a four-lane,” he said.

One reason for the connector from Pella is to improve freight movement in and out of the city and to replace existing narrow, curved and hilly roads that for the most part lack shoulders.

The feasibility study should be completed by October. The project is expected to cost in the millions and last from six to 10 years.

Herald City Editor Michael Schaffer can be reached by email at mschaffer@oskyherald.com



print this story    email this story   






autoconx
Premier Guide
Find a business

Walking Fingers
Maps, Menus, Store hours, Coupons, and more...
Premier Guide

Premier Guide

Help Wanted Ads

Shopper Carriers Needed
Need Money?
Carriers needed for Oskaloosa Shopper walk routes. Different area of town available. Routes are assigne
...>MORE

Advertising Sales Representative
Looking for A New Career?

Visit with us today about a future in newspaper
advertising.
Successful
...>MORE

CORRESPONDENTS NEEDED
CORRESPONDENTS NEEDED for gathering news and information in the following cities: Oskaloosa, New Sharon and University P...>MORE

See all ads

Real Estate

Hawkeye Property Management
Call Chris!
Hawkeye Property
Management,
(641)673-8424 or (641)660-2259,
for information on their c
...>MORE

Mobile Home for Rent
3 bedroom , 1 bath. Includes appliances. private lot. 2 car garage. No dogs. $400 month & deposit. Available April 1st....>MORE

Apartment in Melcher
Ground level
2 BR apt in Melcher
All Utilities Paid,
Onsite Laundry
Equal Housing
Opportunit
...>MORE

Apartments for Rent
Now Accepting
Applications
for Immediate
Move ins

Grant and Lincoln
School Apartments...>MORE

Apartment in Eddyville
1 & 2 Bedroom Apts in Eddyville with Free Internet! Tenant Pays Electric & Water, $350/month. Call Rob Today! 641-660-44...>MORE

House for Rent
3 bedroom house, remodeled. No pets. 1107 2nd Ave West. Rent $625 & Sec dep $625. Call (641)295-2061...>MORE

Apartment for Rent
1003 N 2nd St. 1 bedroom, All appliances included. Carport. No pets or smoking. $395. Available April 1st. (641)660-0206...>MORE

Apartments for Rent
1 & 2 bedroom apartments. Utilities included except electric. Option to rent garage. Deposit $175. Lease required. Sout...>MORE

Apaprtment in Bussey
2 BR Apt in Bussey
Rental Assistance
Available.
All Utilities Paid,
Onsite Laundry.
Call 641-
...>MORE

Apartment for Rent
one bedroom upstairs apartment 307 1st Ave E.  Lease, deposit and references required.  Quiet lifestyle.  No smoking or ...>MORE

See all ads

Other

Computer for Sale
BRAND NEW DELL DESKTOP COMPUTER
Dell Vostro Desktop Computer purchased in last 6 months but never used. Includes t
...>MORE

Furniture Sale
Amana Walnut
Furniture for Sale

Beautiful, solid walnut Amana furniture available in the classic Amana
...>MORE

Pigs for sale for 4H & FFA showing
For Sale 4H & FFA Pigs for the County Fair. Duroc/ York cross. (641)660-1730...>MORE

Moving Sale
Moving Sale March 15th - April 9th. Call for appointment (641)295-4655...>MORE

See all ads


Promises - weddings - engagements- anniversaries

 

Community Newspaper Holdings, Inc.CNHI Classified Advertising NetworkCNHI News Service
Associated Press content © 2009. All rights reserved. AP content may not be published, broadcast, rewritten or redistributed.
Our site is powered by Zope and our Internet Yellow Pages site is powered by PremierGuide.
Some parts of our site may require you to download the Flash Player Plugin.
View our Privacy Policy
Advertiser index